Double Black Diamond Solar Project, Illinois, US
Written by Black Hot Fire Network on October 14, 2023
The Double Black Diamond Solar Project is expected to be operational in 2024. Credit: Vinson & Elkins.
The Double Black Diamond Solar Project is being developed by Swift Current Energy. Credit: Swift Current Energy.
The project, once completed, will have an installed capacity of 800MW. Credit: Swift Current Energy.
The Double Black Diamond Solar project is being developed by Swift Current Energy, an electric utility company based in Boston, US. Construction works for the project commenced in March 2023.
The project is expected to be operational in the later part of 2024 and requires . . .